';
side-area-logo

we built that
Civic & Institutional
Civic

Port Coquitlam Community Centre
Port Coquitlam
Image
Port Coquitlam Community Centre
Under Construction

Fast-track 205,000 sf multiplex with the Terry Fox Library, three ice rinks, an aquatic centre, lounge, fitness centre, gymnasium, change rooms, community space and a 500-stall below grade parkade.
Terry Fox Library
Port Coquitlam
Image
Terry Fox Library
Two-storey light-filled branch with a ground-floor children’s section and administrative offices and a computer lab on the second floor. The library is situated on the north side of the Port Coquitlam Community Centre.
Langley Events Centre
Langley
Image
Langley Events Centre
Fast-track 250,000 sf multiplex with an NHL ice surface with 3,500 seats, 2,200-seat triple gymnasium, gymnastic and fitness facilities, commercial, retail and office space, and 500-seat exhibition and banquet space. Green building design and construction.
Mosaic Place
Moose Jaw
Image
Mosaic Place
Design-build 208,000 sf multiplex with a 5,000-seat NHL ice surface arena, full-service corporate suites and a 500-seat eight-sheet curling rink with full-service hosting area. LEED® Silver®.
Moose Jaw Field House
Moose Jaw
Image
Moose Jaw Field House
Design-build 114,000 sf Field House with an indoor soccer pitch, running track, national-size soccer turf, 365 meter track and fitness centre. The Field House was built in conjunction with the Mosaic Place multiplex.
Chilliwack Coliseum
Chilliwack
Image
Chilliwack Coliseum
Design-build 144,000 sf multiplex with an NHL size ice arena with 5,000 seats, a secondary NHL size ice surface with 300 seats, eight corporate boxes and 20,000 sf of community use space.
Killarney Seniors Centre
Vancouver
Image
Killarney Seniors Centre
Design-build addition of senior’s centre to Killarney Community Centre, including multi-purpose rooms, lounge and kitchen plus connection to existing community centre. LEED® Gold®.
South Arm Community Centre
Richmond
Image
South Arm Community Centre
Phase 1 consisted of the removal and replacement of rooftop HVAC units and ductwork, in addition to a new roof, electrical controls, lighting, roof drains and security fencing. Phase 2 involved the renovation of a 31,000 sf two-storey facility with a gym, multi-purpose rooms and fitness centre.
Institutional

Pacific Autism Family Centre
Richmond
Image
Pacific Autism Family Centre
Three-storey centre with family support and accommodation, recreation, training, research and treatment. Green building design and construction.
John Volken Academy
Surrey
Image
John Volken Academy
Residential substance abuse treatment facility with 100-bed social housing, combined office and warehouse, and a recreation centre with gym.
John Paul II Pastoral Centre
Vancouver
Image
John Paul II Pastoral Centre
Four-storey centre with a chapel, offices, meeting and training rooms, parkade and an attached two-storey nine-unit residence for retired priests. LEED® Gold®.